Global Edition
Global Edition
UK Edition
EU Edition
US Edition

Understand the story, not the spin.

Markets

South Eastern Railway orders probe into Vande Bharat brake failure

Published 16 November 2026 · All stories from this day

South Eastern Railway has ordered an investigation into how an empty Vande Bharat chair car rake travelled about 463 km from Hatia in Jharkhand toward Jhansi in Uttar Pradesh on October 24 with its coaches’ brakes ineffective. The railway zone’s November 7 order says the rake relied on the hauling locomotive’s brakes and regenerative braking during the journey.

The order says the rake was being moved by a freight locomotive and that its braking system was supposed to be integrated with the locomotive’s. A brake test after departure from Hatia found the train’s brake power poor and ineffective, according to the order. At Ranchi, the loco pilot submitted a written complaint to railway staff, including the section controller and traction loco controller.

The rake was nevertheless allowed to continue, the order says. A second loco pilot, who took over at Muri, also reported poor braking to the relevant controllers. The order says he specifically reported that the brakes could not be applied by dropping brake-pipe pressure.

At Deen Dayal Upadhyaya station in Uttar Pradesh, railway staff inspected the train and found that the braking systems of all the coaches had been isolated,...

Now playing
0:00 / 0:00