Army delays Iowa lead azide detonation until Monday
The U.S. Army has postponed until Monday, Nov. 23, a planned controlled detonation of degraded lead azide at the Iowa Army Ammunition Plant in Middletown. Acting Army Secretary Adam Telle announced the three-day delay; the Army had not announced a time for the operation as of Friday, Nov. 20. The detonation has not yet taken place.
The Army plans to destroy 68 barrels containing about 9,700 pounds of the explosive in two controlled detonations. Telle said the operation was delayed to the latest possible moment before a forecast temperature drop, which he said could further destabilize the material. The Army has said moving the degraded explosive could risk an accidental detonation, making destruction in place its preferred option.
The operation is expected to produce dust containing some lead. The Army says it will use earthworks, wet the soil and operate water misters to reduce airborne particles. It also plans to monitor air around the plant during the operation and take samples afterward to identify material that may need cleanup. Updated plume maps released before the postponement reportedly reduced the potential dust zones, but numerical estimates of projected lead levels...